制服丝袜国产欧美在线_久久国产第区二区三区日韩精品_露脸国产精品自产在线观看_国产亚洲精品网站app_人妻熟妇乱又伦精品视频麻豆_男人边吃奶边激烈摸下边的视频_欧美三级大片在线播放_中文字幕欧美视频_国产探花黄色电影_999久久久免费精品国产

?
?
Anchor Drilling machine soil conservation
writer:ld-driller | time:2020-09-03 16:05:32

Anchor Drilling machine of Qianshan machinery after 7~8 days of soil cable anchor cable grouting maintenance, when the anchor strength is greater than 15Mpa and not less than 75% of the design strength, after the bearing capacity is confirmed, install the enclosure on the supporting structure, conduct prestressed tension. The Tensioning equipment is the same as the prestressed structure, and the prestressed value is 75% ~ 80% of the designed anchoring force.

Note the following matters during tension:

The tension should be separated by one; Before the formal tension of anchor cable, 10% ~ 20% of the designed tension should be taken, and cable anchor should be pre-tensioned for 1~2 times; The formal tension of anchor cable should be graded loading, after each level of loading, the load should be stable for 3min, and the elongation value should be recorded; Load step by step until 80% of the designed anchoring force, and the last level of loading should be stable for 5min, and the elongation value should be recorded; when there is no obvious attenuation of the tension bar, the tension bar can be locked; After the design tension is completed for a period of time, depending on the attenuation of the tension bar, some cable anchor can be appropriately overtensioned.